X Anchor

Pier Foundation Grouting Package

Black Jack Grout Pumps Logo
Manual Single-Cylinder Grout Pump

Returns foundations and footings to 100% load-bearing status.

In accordance with IBC Chapter 18 Soils & Foundations Section 1803.5.7, lifting any type of pier alters compliance, from load-bearing to point-load. After foundations and footings are lifted in the stage one pier lifting process, stage two MUST be completed to remain IBC compliant per “Soils & Foundations 1809.2-1804.5-1804.6”.
https://codes.iccsafe.org/content/IBC2018/Chapter-18-soils-and-foundations

Black-Jack Grout Pumps is the ONLY provider of equipment and a mixture that meets or exceeds the MANDATORY International Building Code (IBC) & state regulatory compliance for stage two of the pier lifting repair process


Package Includes:

  • Full auto reciprocating grout pump with hopper charging system
  • Electric hydraulic power unit
  • 10 foot 1.5 inch grout hose
  • 1.5 inch female to 2 inch male bushing (connection for grout pump discharge)
  • 1.5 inch union
  • Multi-port grout diffuser
  • 1.5 inch schedule 40 - 90 degree elbow
  • 1.5 inch street L- (1.5 inch male to 1.5 inch female)

$4,995 - As Low As $137/Month ➜ Financing